Liquid applied membranes embassy site tour.

We are visiting the prestigious Embassy Gardens today, where the project is in phase five.

The embassy gardens front water feature, prepared and installed by liquid applied membranes.

This water feature will be one of the main attractions in the embassy gardens based at the entrance overlooking the beautiful American Embassy.

Surface preperation is key and special care and attention has been taken by lam to make sure our fiberglass lining surface has the correct adhesion properties.

Once the surface is prepared to specification, we apply a primer resin to seal off the concrete substrate and apply the layers of glass fibre which bond to the concrete.

Once the fibreglass layer has become uniform, the top cost is installed. This to layer seals the fibreglass giving and impact resistant and hygienic grp lining.

Got a project like this?

Request a Callback Today and we’ll be happy to discuss your lining requirements.

Request Callback