Victoria Park – Leamington Spa (GRP Lining to Paddling Pool)

  • Home
  • /
  • Victoria Park – Leamington Spa (GRP Lining to Paddling Pool)
Problem

We were recently appointed by a main contractor to carry out the GRP lining works to a newly constructed paddling pool at Victoria Park in Leamington Spa

Solution

Following the detailed design specification, our team installed a bespoke GRP lining system engineered to meet the exact requirements of the site.

Installation

This solution offers outstanding flexibility to accommodate structural movement, along with exceptional durability to withstand continuous water exposure. Importantly, the lining also contributes to a safe play environment, making it ideal for public leisure spaces

Completion

Works were completed on schedule, with careful attention to finish and function in preparation for commissioning. After thorough testing and inspection, the paddling pool was successfully commissioned and opened to the public.

Feedback

Our client was pleased with the high standard of workmanship delivered and has expressed satisfaction with the performance of the lining system.