Cooling Tower – Sheffield Bakery
- Home
- /
- Cooling Tower – Sheffield Bakery
We were contacted by a returning customer who required a reliable solution for their second cooling tower, following the success of our previous works
SolutionThe scope was a carbon copy of the initial project, with a GRP lining system agreed upon to ensure long term protection and durability.
InstallationOur team swiftly mobilised and carried out thorough mechanical preparation, creating a suitable adhesion key across all surfaces. Despite the confined space and challenging angles, the GRP lining process was executed with precision and care. Each layer was applied methodically to guarantee full coverage and structural integrity.
CompletionOnce the lining was complete, we applied and cured the final topcoat, delivering a clean and resilient finish. The cooling tower was then ready for commissioning, meeting all performance and safety expectations
FeedbackThe client was once again pleased with the outcome, reinforcing their trust in our team’s consistency and workmanship